1. That, the K. M. A should include in the M. O. U the source of funding for the project.
2. That we want legal actions to be taken in court of law should there be any breached in the M. O. U instead of the arbitration which the K. M. A is suggesting that is final and binding
3. That , the K. M. A should come out with proper drawn plan for the proposed modern terminal at the Sofoline.
4. That , names of all existing Unions currently operating at the terminal should be listed in the M. O. U
5. That, the time frame for the project should be stated in the M. O. U as well as the name of the contractor for the project.
6. That, the M. C. E should append his signature on all letters send to the association, with regard to the Sofoline terminal Re-construction project including the signing of the M. O. U. The K. M. A should stop the, signed for signed for habit
7. That , the K. M. A should include in the M. O. U . whether the project is B. O. T .
The above proposal which the association made to the assembly and was rejected had given us strong belief that, there is something wrong with the signing of the M. O. U as well as the Execution of the project. We Want K. M. A to Ratify the current M. O. U. Before we can append our signature
.....................
.....................
Sign Chairman Kwasi Boamah 0244290846
Chairman Mintah 0244861263
Chairman Sezer 0504363014
No comments:
Write comments